Heiden
Sägewies III

Sunny & quiet location in the Appenzell Vorderland
Only a few 3.5-bedroom condos still available
Under construction, ready for occupancy in early 2027—help design the interior now!

STRUCTURAL WORK COMPLETED – READY FOR OCCUPANCY IN EARLY 2027
The structural workon the Sägewies III project in Heiden is complete—and now begins the exciting phase of turning a space into a home. Those who decide now still have the opportunity to have a say in selected design details and customize their apartment to suit their own preferences.

High-Quality Living Space on a Green Hillside
In a sunny location in Heiden, the new Sägewies III development is creating a total of 15 high-quality condominiums in three stylish residential buildings. The sunny, fog-free hillside location on the southern edge of the village combines living close to nature with excellent accessibility and the benefits of an attractive infrastructure.

The range of apartments extends from spacious 3.5- and 4.5-room apartments to exclusive 5.5-room penthouses. Thanks to their consistent south-facing orientation, all apartments benefit from optimal natural light and a high level of living comfort. Spacious terraces create seamless transitions between indoor and outdoor spaces and invite residents to enjoy the tranquility and the view. Practical outdoor storage areas provide additional storage space while also ensuring pleasant privacy between the individual outdoor areas.

The penthouse apartments offer something special: In addition to spacious, partially covered terraces, they feature direct elevator access and provide an exclusive living experience of the highest caliber.

Come home to peace and quiet
This new development marks the end of Sägewiesstrasse and is thus located at the end of a quiet cul-de-sac. A network of footpaths runs along the northern side of the property, conveniently connecting the three building entrances. Visitor parking is available in the immediate vicinity. For residents, the spacious underground garage offers convenient parking spaces. The entrance was deliberately placed on the northwestern edge of the property, away from the living areas—ensuring a quiet and relaxed living environment.

CHOOSE YOUR
DREAM APARTMENT

Here you can view all apartments at a glance or filter them according to your preferences. Click on a specific unit to view details and floor plans. By the way: You can save your apartment selections at any time for later and access them in your watchlist.

House
A B C
floors
ground 1st 2nd
Number of rooms
3.5 4.5 5.5
Living space
100 m² 210 m²
Price
730000 1440000
top (5) House Room floor Living space Price Bookmark
B 0.2 House: B 3.5 ground 101.9 m² 830000
C 0.2 House: C 3.5 ground 101.9 m² 830000
A 2.1 House: A 5.5 2nd 202.4 m² 1440000
A 1.2 House: A 3.5 1st 101.9 m² 770000
A 0.2 House: A 3.5 ground 101.9 m² 830000

Unfortunately, there are no apartments available

Object Name
House | Floor | Top
Project Name
Living space
  • Element
Purchase price of the apartment
plus utilities
Monthly rate starting at
Investor: Purchase price of the apartment
plus sales tax and additional charges
Purchase price for TG parking space
plus utilities
Investor: Purchase price for TG parking space
plus sales tax and additional charges
Operating costs

A property on
the sunny side


Infrastructure within walking distance and good transport connections:

  • 3 minutes by car to Heiden train station
  • 5 minutes walk to the Migros supermarket
  • 10 minutes walk to the center of Heiden
  • Shopping facilities, restaurants, cafes, etc. in the town center
  • 5 minutes walk to the nearest bus stop (Trogen, Heerbrugg, Reute)
  • 20 minutes by car to St. Gallen

Recreation within easy reach:

  • A few minutes' walk to the Chindlisteinweg entrance – circular hiking trail
  • 5 minutes' walk to the Heiden ski lift
  • 10 minutes' walk to the Heiden outdoor swimming pool
  • 15 minutes by car to Lake Constance
To view the map on Google Maps, you must allow the script to load.
  • 5 minutes on foot to Migros, 3 minutes by car to Coop
  • 5 minutes on foot to the Bissau bus stop, 3 minutes by car to the Heiden train station
  • 20 minutes by car to St. Gallen
  • Kindergarten, primary/secondary schools, health academy in the vicinity

Construction progress

We’d love to keep you updated! Just enter your email address, and we’ll send you regular construction updates.

February 2026

The shell construction has been completed, the underground parking garage and basement have been partially backfilled, and the scaffolding has been erected. This means that the conditions for the erection work have been met. The carpentry work is expected to be completed on all three buildings by mid-March. The first windows have been delivered and will be installed in the coming weeks ... Read more
November 2025

Construction work on the three apartment buildings on Sägewiesstrasse in Heiden is progressing according to plan and at a pleasingly rapid pace. Only the final ceiling remains to be completed on Building A before the attic can be erected in January. Read more
October 2025

The ceiling above the first floor of house A has been successfully concreted. In House B, the ceiling of the 1st basement floor has been completed. The walls of the 1st basement floor of House C have been completed. The next stages of the construction process now include the backfilling work and preparations for the next concreting stages.
July 2025

The cranes have been erected and the first walls of the UG have already been concreted.
May 2025

Our drone shows: The construction work is progressing rapidly – everything is going according to plan. The foundation stone for modern living in a green environment has been laid.
May 2025

The work on the Sägewies III hillside development on the southern edge of Heiden is progressing according to plan. Slope stabilization work and excavation of the building site are currently taking place. As soon as the excavation reaches the underground parking level, the first construction crane will be erected. The first concrete work is scheduled for June.
March 2025

In Heiden, construction work on the new Sägewies III project is progressing according to plan. The site is being excavated piece by piece and the building site is being prepared.
December 2024

The ceremonial ground-breaking ceremony and thus the start of construction for the new Sägewies III project in Heiden took place this week before Christmas. In the presence of project participants, representatives of the municipality of Heiden, buyers and the ZIMA Projektentwicklung AG team, the starting signal was given for the three-part building ensemble. Let's get started!
September 2024

The building plot in Heiden shows its most beautiful side – the new “Sägewies III” project will create high-quality condominiums in a wonderful hillside location. Construction can start soon!