Village center within walking distance
Construction start autumn 2024, completion autumn 2026

Stylish living in a wonderful location


The Living Lagundum new-build project involves the construction of three residential buildings in a beautiful location in Mitterplars, which blend in perfectly with their surroundings thanks to the chosen architectural style. A smaller residential building (House C) with a gabled roof is being built on the street side. Green flat roofs are planned for the two residential buildings (Houses A and B). The buildings will be harmoniously integrated into the terrain thanks to gentle height gradations. Different materials will be elegantly combined on the facades. A spacious, open area awaits you at the heart of the complex. Here, selected plants and furniture will create a park-like atmosphere that invites you to linger.

The Climate House "A" Nature offers you an extremely low energy balance and first-class standard fittings. ZIMA guarantees the highest quality construction, with residential units, basements, and garages in various sizes. The interior fittings, including tiles, wooden floors, doors, and bathroom fixtures, are individually designed and selected according to the customer's wishes.

Choose your
dream apartment

Here you can find all apartments at a glance or filtered according to your preferences. Details and floor plans are available by clicking on the respective unit. You can save your apartment selection at any time for later and access it in your watch list.

house
B C
Floors
Ground 1st 2nd
Number of rooms
2 3 4
living space
60 m² 120 m²
Price
310000 630000
top (5) house Rooms floor living space Price Save
C02 House: C 2 Ground 68.5 m² 354000
C01 House: C 3 Ground 86.9 m² 426000
B15 House: B 3 2nd 86.9 m² 436000
B09 House: B 3 1st 92.1 m² 446000
B01 House: B 3 Ground 110 m² 536000

Unfortunately, no apartments are available

Object name
House | Floor | Top
Project name
living space
  • Element
Apartment purchase price
plus additional costs
Monthly installment from
Investor: Purchase price apartment
plus VAT and ancillary costs
Parking space purchase price
plus additional costs
Investor: Purchase price TG parking space
plus VAT and ancillary costs
Operating costs

ON THE SUNNY SIDE
OF LIFE


Welcome to Algund, Mitterplars – a picturesque village in the heart of South Tyrol, known for its breathtaking landscape and excellent quality of life. The lush orchards and vineyards outside your front door invite you to take relaxing walks and wine tastings.

Everyday life is also easy to master thanks to the excellent infrastructure. Schools, kindergartens and various shopping facilities are easily accessible. Numerous restaurants and cafés in the area invite you to linger and enjoy the regional cuisine.

Thanks to the excellent transport connections, you can quickly and easily reach the surrounding cities and sights. For example, after just a few minutes' drive you can reach the historic city of Meran, which is known for its charming old town, thermal baths and diverse cultural offerings.

To display the map from Google Maps, the script must be allowed to load.
  • Approx. 2 minutes by bike to the center of Algund
  • Numerous hiking and cycling trails in the area, high quality leisure activities
  • Various schools and kindergartens within walking distance

construction progress

We will be happy to keep you up to date! Enter your email address and we will send you regular construction updates.

January 2026

The planned widening of the access road to the construction project in Lagundo/Mitterplars began in the first week of January.
December 2025

In House A, the rough electrical and plumbing installations were completed and the foam concrete was installed just in time before the Christmas holidays.
October 2025

In House A of the residential complex, the ceiling above the roof is about to be poured, while the brick walls have already been erected on the lower floors and the basic installation - heating and sanitary facilities - has begun. In House B, the ceiling above the 2nd floor is currently under construction.
September 2025

The structural work on buildings A and B is progressing rapidly. The upper floor ceiling of House A has already been concreted, as has the first floor ceiling of House B. Work on the backfilling is underway and the first coat of paint has been applied in the garage area. Work will soon start on the walls on the first floor of House A.
March 2025

The excavation pit protection is in the final phase and is about to be completed. The excavation of the pit is almost complete. The next step is to assemble the crane so that the remaining construction work can continue on schedule.
December 2024

Work on the demolition, excavation of the construction pit and the necessary excavation pit safety measures began back in December.